Why your pFMEA and Control Plan don’t always agree

Two documents, built by the same team, that still drift apart. Why it happens, and how one list of features keeps your pFMEA and Control Plan aligned and traceable.

Two documents, built by the same team, that still drift apart. The pFMEA and Control Plan are created separately, yet in principle they describe the same reality.

The problem: one small mismatch

Not because anyone is careless, but because both documents can easily run to hundreds of lines. Keeping every feature and control consistent, by hand, is hard to do perfectly every time.

A typical example: row 47 of the pFMEA says flatness < 0.05 mm after heat treatment, CMM check, 100% inspection. Row 12 of the Control Plan says flatness spec, post-braze, sample check, 1 in 10 parts.

The same feature, described differently in the pFMEA and the Control Plan.
The same feature, described differently in the pFMEA and the Control Plan.

Why it happens

None of this is intentional. A feature described one way in the pFMEA ends up worded differently in the Control Plan. A control added during a review isn’t always carried over.

There is rarely enough time to double check every line across both documents as changes accumulate. This really calls for software support.

Start from one list

A Characteristics Matrix lists every feature and the process steps where it applies. Every feature analysed in the pFMEA is the same feature controlled in the Control Plan, because they came from the same list.

One Characteristics Matrix feeds both the pFMEA and the Control Plan.
One Characteristics Matrix feeds both the pFMEA and the Control Plan.

Traceable at a glance

This is useful for more than your own team. An auditor can follow a feature from the Characteristics Matrix to the pFMEA and directly into the Control Plan: characteristic 6a, hole diameter Ø 0.80 ±0.05 mm, appears with the same number, the same requirement and the same detection method in all three documents.

Feature 6a traced from the Characteristics Matrix through the pFMEA into the Control Plan.
Feature 6a traced from the Characteristics Matrix through the pFMEA into the Control Plan.

One feature, one number, two aligned documents

In IQARUS, the Characteristics Matrix feeds directly into the pFMEA and Control Plan, with a reference number assigned to each feature automatically. All documents stay aligned, even after a process change, with easy traceability for internal document control and audits. Read also what is a Control Plan.